Our Projects
Swan River Crossings

Project
A new extradosed bridge with cantilevers and cable support will be built on the existing Fremantle traffic bridge alignment over the Swan River, inclusive of earthworks, services, drainage, roadworks, retaining walls and principle shared paths.
Client
Main Roads WA
Services
Independent Estimator Role
Review of Alliance DCT
Preparation of BAU Estimate
Review of Market Testing
MRWA Reports
Benchmarking
Metronet Projects

Projects
Thornlie – Cockburn Link (TCL)
Yanchep Rail Extension (YRE)
Kenwick Rail Freight Facility
Byford Rail Extension (BRE)
Victoria Park – Canning Level Crossing Removal (LXR)
Client
Public Transport Authority
Services
Strategic Commercial Advice
Constructability Advice
Design Interface Management
Claims & Variations
Project Troubleshooting
Strategic Estimation Services
Regular Forecast Reviews
Benchmarking Database
Stephenson Avenue Extension

Project
Stephenson Avenue grade separated interchange at Mitchell Freeway. A new road connecting Sarich Court to Cedric Street on the west side of the freeway, including a new bridge for Stephenson Avenue. New shared paths, modifications to Mitchell Freeway and Cedric St interchange, and new access to Stirling Station car park.
Client
Main Roads WA
Services
Cost Forecast Review
EnergyConnect

Project
EnergyConnect is Australia’s largest energy transmission project. It involves building a new 900km transmission line to connect the energy grids in New South Wales (NSW), Victoria (VIC) and South Australia (SA). Supporting infrastructure will also be built or upgraded, including a new substation between Buronga and Wagga Wagga.
Client
Transgrid NSW
Services
Costing Framework for Major Projects
Project Troubleshooting Guide
Estimate & Forecast Reviews
Benchmarking Guide